Why next-generation avionics validation is becoming a value driver for aircraft leases. Avionics are the nervous system of ...
Mitsubishi Power and Mitsubishi Electric have completed functional testing of their jointly developed next-generation gas turbine control system for thermal power plants.
Tests that simulate the temperatures and pressures which the reactor systems will be subjected to during normal operation have started at the demonstration high-temperature gas-cooled reactor plant ...
With the electrification of automobiles, it’s not enough to test the new electronics thoroughly at the end of the manufacturing process. Safety standards now require that tests be performed live, in ...
This article is a condensed version of an article that appeared in the November/December 2022 issue of Chip Scale Review. Adapted with permission. Read the original ...
Results that may be inaccessible to you are currently showing.
Hide inaccessible results
Feedback